Apollo 11 Eagle Grumman LM-5 Construction Log Wiki
Advertisement
Apollo11EagleNotebookPg066
<Brief page summary to go here.>

Grumman Aircraft Engineering Corporation

LOG


Page No 73116

Engineer

S. SARBELLO

Project

LM-5

Location

ACE-3

Time

NIGHT SHIFT

Title

Date

8/16-17/68

1. HOMBURGER VERIFIED IMU INSTALLATION NOT THE CAUSE OF ISOLATION PROBLEM.

2. TONIGHT PTA UNIT WAS INSTALLED -- ALSO NOT THE CAUSE OF ISOLATION PROBLEM. ISOLATION OK (300 Ω) TO DATE. RREA & RRAA STILL OPEN ITEMS TO BE REINSTALLED & EVALUATED.

3. RAN TDR #33 TO STEP #49. ALSO RECONNECTED P722 & PSAAM.

4. TOOK BIDDLE-DUCTER READINGS AND TORQUE MEASUREMENTS ON TDR #3 (STEPS #227 THRU #232). CONFIRMED HIGH Ω READING BETWEEN ECA 4-4 AND 4-2. REMOVED ALL MOUNTING HARDWARE AFTER TORQUE MEASUREMENT SHOWN TO BE WITHIN SPEIFIED TOLERANCES (60"/LBS +/- 5). HARDWARE & PHENOLIC COVERS HELD BY FRANK DAMIS, DEPT 053. RECOMMEND CLEAN ALL HARDWARE OF POTTING COMPOUND AND OXIDATION THEN REASSEMBLE AND RE CHECKED BY BIDDLE-DUCTER. THE COMPOSITE DATA IS AS FOLLOWS:

FLUKE METHOD

ECA #3

TERM 4-2 = .36 MΩ

TERM 4-1 = .48 MΩ

ECA #4

5.10 mΩ

5.14 MΩ

BIDDLE-DUCTER

ECA #4

6.8 MΩ

8.5 MΩ

Previous page (65) index Next page (67)