On the night of July 8, the night shift was prepared to test the battery feeder lines, but couldn't get the tester they needed from Q.C. The Day shift was able to get the tester, but the data seemed off. Additional testing confirmed that the tester was inaccurate. They day shift recommended that the night shift repeat the test with the accurate tester. | ||
Grumman Aircraft Engineering Corporation LOG Page No 73079 Engineer E. DOWSE / S. SARBELLO Project LM-5 Location PLT 5 Time 7:48AM - 8:18 PM Title Date 7/8/68 1. GENERATED STATUS REPORT ON EPS TDR'S AND SUBMITTED TO ROSS FLEISIG. 2. SOLD TDR'S # 16, 18, 22, 23 + 24 . 3. TDR'S # 12+#13 ARE STILL OPEN + WON'T BE RESOLVED UNTIL THE PROPER CONNECTION OF THE 4 # 119 WIRES ARE CONNECTED AS PER LDW280-54359 CONTROL # LM5-14050. THE PAD SUPERVISOR IS WORKING ON THIS PROBLEM. _____________________________________________________________ E. HOMBURGER 7:48PM - 8:18AM 7/8-9/68 | ||